Case Study 2

Case study

Faridabad Steel Manager : pricereduction using
Reva Crane Brain

25/5T X 18.24M Span crane is required i.e. With Main hook having slow spped for heavier load and Auxiliary hook with high speed for lighter load.

Project Challenges

  1. Lesser operating cycle time so he can utilize working hours efficiently.
  2. Lesser hook approaches requirement for better utilization of working space.
  3. Cost How can meet the client requirement with best price ?

Solution –

  1. We introduced special arrangement (REVA CRANE BRAIN) with VFD& by which speed increased by 2 times in unloaded condition for all motions
    Operating cycle time reduced upto 40% & productivity by more than 2 times.
  2. Auxiliary Hoist omitted & cost reduced by 15% of the equipment.
  3. Crab size reduced by omitting auxiliary hoisting machinery & work space increased by reduced hook approaches reduced through out the complete bay length.

Impact on Client

Results 👍
savings of

20 Lakhs Approx
by removing the use of Auxiliary Hoist and increasing the speed of the main hoist using Reva Crane Brain