Reducing Cost of Project is the main concern for any project engineer. Here the ways by which one can reduce the cost
- Crane Weight and wheel loads : Involve us from the inception of design of the buildings. Crane wheels loads is one of the major factors in the designing of the building structure and its footings and foundations. This part of the industry works majorly on the approximations and can Burn your Money. Contact us for the accurate and calculated wheel loads.
- Reduction in Building Heights. Height of the Building also takes major part in the overall cost of the building structure and the footings. The higher the building the more will be the wind loads and hence more will the structure be.
And the major factor is the headroom approximation above the gantry level. Contact us to provide you the accurate headroom requirement.
We also have special designs for Low headroom Cranes and Hoists, which can further reduce the headrooms and the hence building costs.
In one of the case studies done by us the Entire Cost of the Crane could be compensated with the reduction in the building and footings cost.
3. Opt for 8 wheel design crane instead of 4 Wheel Design crane.
The more distributed the load is the lesser will be the structure required to handle it.
Insist your crane vendor to provide you with the 8 wheel configuration crane, which will have more contacts on the gantry girder and hence the size of the gantry girders will reduce.