Call us: +91 98994 84744
Mail us: [email protected]
A 7.5T 50M Span crane is required for defence to be installed in a Airplane Hangar for maintenance of the aircrafts. The building is already ready.
Questions
Solutions :
Lower dead weight :
Transportation issue :
The girder was made in such a way that it could be split in 2 parts and rejoined at site.
Results 👍
The approximate savings cannot be calculated as the hanger was already built with the incorrect design earlier, however a savings of around
Happy clients
Team Strength