EOT cranes are an essential piece of equipment for heavy fabrication industries, providing efficient and reliable material handling capabilities to help streamline production processes and increase productivity.
Reva has more than 50 years of experience in manufacturing and helps reduce the downtime of the cranes
Problem | Solution | Benefits |
---|---|---|
Wrong Selection of the Class of Duty. Normally the user is not knowing the class of duty and to save cost opts for class 2 duty cranes only | During pre-order stages - understand the need of the customer, total working hours and the frequency in which the Full SWL is to be operated. Accordingly decide the class of duty | Longer Life and correct crane |
Overloading leads to Failure of cranes as thought 125% is normalĀ | Trained and convinced the user that load being handled should not be more than the SWL at any time | Longer Life and safe crane |
Tilting and turning the load | Introduced Aux hoisting, so that the AUX can be used for tilting the big structuresAlso Suggested VVVF Drive in all 3 motions and with all 3 motions simultaneously the load could be turned easily and safet | Safety |
Sway of the Load | VVVF Drive with antisway mechanismĀ | safety |
Overloading. As user does not know what load are they handling | Overload protection with load cell with display | safety |
Poor Maintenance | Training providedYearly Training in our works also started to educate the operators and the maintenance | Longer life |
Poor Crane performance | Checked the rail alignments, due to heavy loads handling the rail track becomes misalligned Regular inspections and maintenance advised Trained not to lift load on inclined /oblique | Reduced Downtime |