Tata Aldesa was awarded order for dedicated freight corridor. The requirement was that 260M longrails would have to be unloaded from BFR and loaded onto Track Laying Machine.
For this application 21 nos of Gantries each with 2t hoist, lifting beam were required. these gantrieswere spaced @12.5M apart.
The application required all 21nos of gantries or group of 7 or 4 or individual to be operated as perapplication use.
Mechanical:
Civil :
Electrical:
PLCs, wired Control Pendants ,wireless Radio Remote, L&T Yaskawa drives, Control desk (in control room), HMIs, Local control panel, Yard lighting, Cameras.
Fixed 21 nos gantries of 8m height and 20 m width are provided at an 12.5m distance along the length of the rail in handling area. On each of these gantries one hoist of 2t capacity is provided, with lifting beam and 2 sets of lifting rail clamps. These are used to unload the rails in synchronous from the BFR, to the adjacent storage area and then from the storage area back to the rail track laying machine.
The hoists are equipped with VVVF Drives which can provide stepless speed in hoisting as well as cross travel motion. This is required for the precise movement of the hoist.
PLC’s are installed in each hoist control panel, further grouping is done in pair for 4 such stations and these are connected to the Master PLC installed in the control room. Master PLC is attached to HMI for operation – control and display.
The gantries are numbered and the status of the individual is shown on the HMI. PLC detects any failure in any of the gantries and displays the same on the HMI.
There are options of Grouping N number of hoists and control them together in synchronization as per operator need. Radio remote option is given where in the complete system can also be operated through radio remote.
Each AC Drive control panel of hoist will be connected to each other via Ethernet Modbus communication for which one no. PLC will be used for every SLAVE panel. further 4 stations are made to connect with 21 no. of hoist panels PLC. And These 4 PLC station will be interconnected via ETHERNET communication while using a master PLC with HMI to controland operate complete system in a user friendly manner.
Results 👍
Reva was one of the first in India to implement working solution from concept of Tata to actual working.